Site and install readiness
A strong building plan can still lose time at the site. Use this page to surface access, grade, concrete, utility, approval, and working-room questions early enough to solve them.
Three readiness tracks
Exact responsibility varies by project. The useful move is to identify each issue and assign it before a date depends on it.
Property
Footprint
Install path
A useful site photo
Wide photos make edge clearance, drainage, grade, nearby obstacles, and equipment access easier to discuss.
Before scheduling
Do not assume concrete, grading, permits, utility locating, or site correction are included until the project scope says so.
Avoid preventable delay
Include the ZIP code, surface type, access notes, and wide site photos when you start the project. That creates a better first review than discovering the same details after scheduling.